You asked for a quote and got a page of numbers and terms. Here's what each line actually means, a worked break-even example you can copy, and the handful of questions that reveal whether a cheap quote is really cheap — or just missing the parts that cost you later.
The short answer: a mold quote has two numbers that must be kept separate — the one-time tooling (building the mold) and the per-part price at a stated quantity. Around them, a complete quote tells you the cavitation (parts per cycle), the tool's steel and rated shot life, the runner type, the cycle time, lead times, the resin, payment milestones, how many sample/modification rounds are included, tool ownership, and what's included vs. not. The cheapest-looking quote is often just the one with the least in it. Read every line, ask about anything missing, and do the break-even math at your real volume. This is general information, not a quote; get your own figures from the manufacturer.
Before anything else, find these two and make sure they're separate:
If a quote gives you only a per-part price, the tooling is buried inside it — which makes it impossible to compare quotes or run your break-even. A real quote states both, so you can calculate landed cost at your volume. Ask for the per-part price at three quantities (a price-break ladder), so you can see how it moves. (Our mold cost estimator walks through the drivers behind the tooling number.)
Landed unit cost = (tooling ÷ lifetime quantity) + per-part price.
| Quote | Tooling | Per-part | At 2,000 parts | At 20,000 parts |
|---|---|---|---|---|
| Shop A (1 cavity, softer tool) | 8,000 | 3.00 | 8,000/2,000 + 3.00 = 7.00 | 8,000/20,000 + 3.00 = 3.40 |
| Shop B (4 cavity, hardened tool) | 20,000 | 1.80 | 20,000/2,000 + 1.80 = 11.80 | 20,000/20,000 + 1.80 = 2.80 |
Same part, same two shops: Shop A wins at 2,000 units, Shop B wins at 20,000. The "expensive" tool is cheaper per part once volume is high enough.
Find the crossover yourself: crossover quantity = (tooling difference) ÷ (per-part difference) = (20,000 − 8,000) ÷ (3.00 − 1.80) = 10,000 parts. Below 10,000 the cheaper tool wins; above it, the better tool does. One more check: will Shop A's softer tool even survive your volume? If it's rated for, say, 10,000 shots and you need 20,000, budget a second tool — which erases its apparent savings. Always weigh per-part price against rated shot life. (All figures are round illustrations, not prices and not a JCH quote.)
| Line on the quote | What it means | Why it matters / what to ask |
|---|---|---|
| Tooling / mold cost | One-time cost to build the mold | Your up-front investment; ask about milestones + refund terms |
| Cavitation (1×, 2×, 4×) | Parts made per cycle | Higher = more tooling but lower per-part at volume |
| Per-part price @ qty | Unit cost at a stated quantity | Ask for it at 3 quantities (price-break ladder) |
| Part size / projected area | How big the part is in the mold | Sets the press tonnage + tool size — a first-order cost driver |
| Mold steel / grade | Tool material (e.g. aluminum, P20, H13, S7) | Aluminum = prototype/bridge; P20 pre-hardened = mid-volume; H13/S7 hardened = high volume |
| Tool life (shots) | Cycles the tool is rated for | Ask for a guaranteed shot count + what happens if it falls short |
| Runner (hot / cold) | How plastic feeds the cavities | Hot = pricier tool, less waste at volume; confirm which |
| Cycle time | Seconds per shot | A main driver of per-part cost; ask for the estimate |
| Press tonnage | Machine size the part needs | Bigger part/area → bigger press → higher machine cost |
| Resin / material | The plastic being molded | Drives cost + properties; resin price swings move the per-part number, so confirm what's assumed |
| Side-actions / lifters | Extra moving tool pieces for undercuts | Each adds tooling cost + maintenance; confirm count |
| T0 / T1 samples + mod rounds | Trial shots + included design changes | Ask how many modification rounds are included before extra charges |
| FAI / first-article | Documented check vs your drawing | Confirms quality before volume; may be extra |
| Texture / finish | Surface treatment | Often quoted separately; a bare quote may exclude it |
| Payment milestones | When money is due | Often a deposit then balance on T1 approval — ask, don't assume |
| Tool ownership + storage | Who owns/holds the mold | Confirm in writing you own it and can move it |
| Currency + Incoterms | Money + shipping terms | Says who pays freight/duties and in what currency |
| Quote validity date | How long the price holds | Material/FX moves can change it after expiry |
The lines aren't independent — they trade against each other, and understanding the trades is how you judge whether a quote is sensible:
So two shops can quote very different numbers for the "same" part simply because they assumed different cavitation, steel, runner, or what's included. That's why you compare the whole quote — and the break-even — not one line.
Send these back to any supplier and the cheap-vs-complete picture clears up fast:
Any manufacturer who can answer these clearly is one you can actually compare and trust.
Send Jack the quote (or your part and target volume) and he'll walk through what's complete, what's missing, and whether the numbers make sense for your volume. NDA first. No obligation.
Book a 30-min callMold cost estimatorA complete injection-mold quote lets you answer each of these from the page itself. If you can't, ask:
Twelve for twelve is a quote you can trust and compare. Gaps aren't deal-breakers — they're your question list.
Two numbers that must be separated: the one-time tooling (mold) cost, and the per-part price at a stated quantity. A complete quote also states cavitation (parts per cycle), the tool's steel/material and expected shot life, runner type (hot or cold), estimated cycle time, lead time, the resin, payment milestones, how many sample/modification rounds are included, tool ownership and storage, and exactly what is and isn't included. If a quote blends tooling into the per-part price or omits cavitation and tool life, ask — those omissions are where surprises hide.
Landed unit cost = (tooling cost / lifetime quantity) + per-part price. Spreading the one-time tooling over how many parts you'll actually make tells you the true cost per unit. Example only, not a JCH price: tooling 12,000 over 10,000 lifetime parts = 1.20 of tooling per part; add a 2.00 per-part price = 3.20 landed each. Run the same math on every quote at YOUR real volume — a low per-part price with high tooling can lose to the opposite at low volume, and win at high volume.
Cavitation is how many copies of the part the mold makes per cycle: a single-cavity tool makes one, a multi-cavity tool makes several. Higher cavitation costs more tooling up front but lowers the per-part price at volume, because you get more parts per machine cycle. The quote should state it, because a low per-part price on a high-cavity tool and a higher one on a single-cavity tool can describe the same shop — you need the cavitation to compare.
The quote should say what the mold is made of and roughly how many shots (cycles) it's rated for, ideally as a guaranteed shot count with what happens if it falls short. Hardened tool steels (such as H13, S7) last longest and suit high volume; a softer steel (such as P20) or aluminum is cheaper and suits prototype, bridge, or low-volume runs but wears sooner. A cheap tooling number on a soft tool can be the right call for a small run — or a hidden cost if you need hundreds of thousands of parts. Match the tool to your real lifetime volume, and ask which grade is quoted.
Common omissions that cost you later: surface texture or polish, inserts or overmolding, a first-article inspection (FAI), the number of modification rounds included after the first sample (T1), design changes made after tool release, runner type, tool maintenance and spare parts, tool ownership and storage, currency, Incoterms (who pays freight/duties), and the quote's validity date. A number that looks low may simply have less in it. Ask for an itemized quote and confirm what's included. This is general information, not a quote; get your own figures from the manufacturer.
Not usually — it's often the one with the least in it (softer tool, cold runner, fewer cavities, exclusions). Compare complete quotes and run the break-even at your real volume, not bare tooling numbers.
Different assumed cavitation, steel grade, runner, or what's included. Pin those down and the quotes become comparable.
Usually yes if you can — a tool you own can generally move to another shop. Confirm ownership in writing and check your contract and local law before you pay for tooling. Not legal advice.