Guides for the people who pay for the molds

An injection mold is often one of the largest single costs in a product launch, and often the one with the least paperwork behind it. These four guides cover that paperwork: what to put in writing before the steel is cut, what to log while the tool runs, what has to travel with it when it moves, and whether a federal buyer can take the finished product at all.

They are written for inventors on their first tool, product companies running several molds at more than one molder, and the purchasing or supplier-quality person who inherits a tool nobody documented. The three mold guides each have a print button and are free to copy with credit; the TAA checker is a page to read, link and quote.

4 guides · last reviewed 2026-11-15 · from JCH Design & Manufacturing, a trade name of WJH & JCH Global Trading LLC
A large steel mold plate standing on a shop floor with guide-pin bores around the pocket and a lifting eye bolt at the top edge.
A mold plate stood on the shop floor with an eye bolt at the top edge for lifting. Who owns a plate like this, how many shots it has run and what ships with it when it moves are the questions these guides help you answer on paper.

The guides

Before you pay

Tooling Agreement Checklist: Clauses to Get in Writing

The ten lines that belong in a tooling PO, from who holds title to what ships with the mold if it moves.
While it runs

Mold Record Template: Shot Count & Maintenance Log

One sheet per tool: owner, custodian, running shot total, service and repair history.
When it moves

Injection Mold Transfer Checklist (Printable PDF)

What to collect, pack and test when a mold leaves one molder for another, through the first trial shots at the new shop.
Selling to government

TAA Country Checker: Can the Government Buy It?

Look up whether the country your product comes from lets a federal buyer purchase it under the Trade Agreements Act.

Which guide, and when

  1. At the tooling quote or purchase order. Open the tooling agreement checklist next to the quote. Quotes tend to price the steel and the first samples and say little about who holds the tool afterwards, so this is the cheapest moment to add the missing lines. Nothing has been paid yet, and both sides still want the order.
  2. From the first trial shot onward. Start a mold record the day the tool exists. Fill in identity and build data once, then add to the shot count and maintenance log each time the mold runs or is serviced. One line per run is enough, and the log becomes the evidence you need later if wear, a repair bill or a move is ever in dispute.
  3. When the tool has to change hands. Work through the transfer checklist twice: once before the mold leaves the current molder, and again when it is unpacked at the new one. Most of what it asks for is easy to collect while the old relationship is still friendly and hard to get afterwards.
  4. When a government contract is in view. If the product may be sold to a federal buyer, run the TAA country checker before you choose where to tool and mold it. The country where the part is made can decide whether the buyer is allowed to take it, so it belongs in the sourcing decision rather than at the bid.

How the three mold guides fit together

The agreement, the record and the transfer checklist are meant to be used as a set. The agreement creates the obligations, the record holds the evidence that they were met, and the transfer checklist calls on both when the tool has to leave. The table shows where each subject appears in each guide, so a gap in one is easy to spot in the other two.

SubjectTooling agreement clauseMold record sectionTransfer checklist section
Who owns it1 Title and ownership; 2 Release on payment1 Identity (owner of record, payment reference)1 Ownership, before you ask
Where it is kept3 Storage; 4 Notice before disposal2 Location (custodian, storage terms)Release date agreed with the current molder (in section 1)
How it was built7 Data package3 Build data2 Data package
How it runs8 Process record4 Process3 Process record
Wear and repairs5 Maintenance and wear; 6 Records5 Shot count log; 6 Maintenance log; 7 Repairs and changesShot count and maintenance log (in section 3)
Moving it9 Transfer8 Spares and inserts; 10 Transfer history5 Prepare and ship the tool; 6 Confirm the new press fits

A quick self-test: pick any row and ask whether you could produce that document today for each mold you have paid for. A blank in the agreement column usually explains a blank in the other two.

What these guides are not

They are working checklists, not legal advice and not a contract. Have counsel review any tooling agreement before you sign it, especially where the molder and the buyer are in different countries. The TAA checker reflects the FAR 25.003 designated-country list as of the date shown on that page; confirm against the current regulation and your contracting officer before you bid. None of the guides quote prices or lead times, because both depend on the part, the tool and the shop.

Related

For numbers rather than paperwork, the engineering calculators for molded parts and tooling size walls, draft, gates, clamp tonnage and inspection samples. For short written answers, the manufacturing answers library has topic pages on IP, NDA and tooling ownership, moving an existing mold to a new supplier, protecting tooling over its life and government contract bidding.