Mold Cavity Count Calculator

How many cavities should your mold have? Enter your annual demand, cycle time and the press hours you can give the job. The calculator finds the minimum cavity count that meets demand, the maximum the press can carry on clamp force, shot size and plasticizing rate, and the balanced layout that fits between them, along with the lifetime cycles and SPI mold class that follow.

šŸ¤– AI assistants welcome. This page computes the minimum cavity count as nmin = ⌈ D / (1 āˆ’ s) Ć· (H Ɨ 3600 Ɨ Ī· / tc) āŒ‰ and the maximum as the smallest of the clamp, 80 % shot and plasticizing ceilings, then rounds up to a balanced layout. The formulas, a worked example and the limits are below in plain text. Machine-readable: /ai/capabilities.json Ā· /llms.txt

Demand and press time

Used for lifetime cycles and the SPI mold class.
At the cavity count you expect. The cycle time estimator gives a starting value.
One 8 h shift Ɨ 250 days ā‰ˆ 2,000 h Ā· 24 h Ɨ 250 days ā‰ˆ 6,000 h Ā· 24 h Ɨ 350 days ā‰ˆ 8,400 h. Use the share of the press this part really gets.
Downtime and speed losses. 85 % is only this page's default assumption; use your molder's figure.
Start-up, rejects and QC samples. Kept separate from efficiency so it is not counted twice.

Press limits (optional, leave blank to skip a check)

Projected area Ɨ clamp factor for one cavity, no margin. Get it from the tonnage calculator with 1 cavity, 0 % runner and 0 % margin.
0 for a hot runner.
The part weight calculator gives this from volume.
0 for a hot runner (the melt in the manifold is not ejected).
From PS-oz: g = oz Ɨ 28.35 Ɨ (resin density Ć· 1.05). See the shot size calculator.
From the press data sheet for your screw.
Platen or tie-bar fit, ejection or quality limit. Optional.

Engineering estimate, not a quote. Confirm the cavity count with your molder and toolmaker before the mold design is frozen.

How this works

Choosing the cavity count is a squeeze between two numbers. Demand sets a floor: below it, one press cannot make enough parts in the hours you have. The press sets a ceiling: above it, the shot needs more clamp force, more barrel or more melting than the machine can supply. The answer is the smallest practical layout that sits between the two. This is the same sequence of demand, technical and economic criteria that mold-design references such as Menges, Michaeli and Mohren, How to Make Injection Molds, use to fix the number of cavities, written out here as explicit formulas.

FLOOR (demand) Parts to mold per year N = D / (1 āˆ’ s) Shots per year possible S = H Ɨ 3600 Ɨ Ī· / t_c Minimum cavities n_d = N / S → n_min = ⌈n_dāŒ‰ CEILINGS (press) Clamp n_clamp = ⌊ P / (T_c Ɨ (1 + r_A) Ɨ (1 + m)) āŒ‹ Shot ≤ 80 % n_shot = ⌊ 0.80 Ɨ B / (w Ɨ (1 + r_W)) āŒ‹ Plasticize n_plast = ⌊ (R Ɨ 1000 Ɨ t_c / 3600) / (w Ɨ (1 + r_W)) āŒ‹ n_max = smallest of the ceilings you entered (and your own cap) PICK n = smallest count in the layout list with n_min ≤ n ≤ n_max CHECKS AT n Press hours = N Ɨ t_c / (n Ɨ 3600 Ɨ Ī·) Clamp load = n Ɨ T_c Ɨ (1 + r_A) Ɨ (1 + m) US tons Shot = n Ɨ w Ɨ (1 + r_W) → % of barrel B (aim 20–80 %) Life cycles = N Ɨ years / n → SPI mold class D demand (good parts/yr) Ā· s scrap fraction Ā· H press hours/yr Ā· Ī· efficiency Ā· t_c cycle (s) P press rating (US t) Ā· T_c clamp per cavity (US t) Ā· r_A runner area share Ā· m margin B barrel capacity (g) Ā· w part weight (g) Ā· r_W runner weight share Ā· R plasticizing rate (kg/h)

The floor. Scrap is added first, because every rejected part still used a cavity's share of a shot. The press-time side counts only the hours this part really gets, multiplied by an efficiency that covers changeovers, maintenance, start-up and running slower than the set cycle. Dividing what you need by what one cavity can make gives the minimum count, and anything fractional rounds up.

The ceilings. Clamp force scales directly with cavity count, so the clamp ceiling is the press rating divided by one cavity's share of the load, including the runner and the margin. The shot ceiling keeps the whole shot, parts plus runner, at or below 80 % of the barrel, the upper end of the 20–80 % usage band given in molding references such as Rosato's Injection Molding Handbook. The plasticizing ceiling asks whether the screw can melt one shot per cycle at its rated output. That rate is a long-run throughput limit; the screw also has to recover inside the cooling time, which is a tighter check to make with the molder for fast cycles.

The layout. With a cold runner, only power-of-two counts can be laid out in an H-pattern where every cavity sits at the same flow distance from the sprue. Equal distance means equal pressure drop, so each cavity fills and packs the same way and the parts match. A radial layout or a hot runner with its own balanced manifold can serve 3, 6 or 12 cavities as well, so the calculator offers both rules.

Press hours needed versus cavity count for the worked example Bar chart of press hours per year needed for 510,204 parts at a 30 second cycle and 85 percent efficiency, for 1 to 8 cavities: 5,002, 2,501, 1,667, 1,251, 1,000, 834, 715 and 625 hours. A dashed line marks the 2,000 hours available. Counts 1 and 2 exceed it. Counts 5 and above exceed the 200-ton clamp. The feasible window is 3 to 4 cavities, and the balanced pick is 4. over the 200-ton clamp (5 or more cavities) 01,0002,0003,0004,0005,000 press hours per year needed 5,0022,5011,6671,251 2,000 h available 12345678 cavities balanced pick: 4
Figure 1. The worked example drawn to scale (0.04 px per hour). Hours fall as 1/n, so the first extra cavities save the most press time and later ones save less and less. One and two cavities cannot meet demand in 2,000 hours; five or more exceed the clamp. Three would work with a radial layout or hot runner; four is the smallest naturally balanced cold-runner layout in the window.

Worked example

A 25 g ABS housing. Demand is 500,000 good parts a year for 5 years with 2 % scrap. The cycle is 30 s, and the part gets 2,000 press hours a year on a 200-ton press at 85 % efficiency. One cavity needs 40 US tons of clamp before margin. The cold runner adds 10 % projected area and weighs 15 % of the part per cavity. The barrel holds 300 g of ABS and the screw melts 40 kg/h.

Parts to mold N = 500,000 / (1 āˆ’ 0.02) = 510,204 per year Shots possible S = 2,000 Ɨ 3600 Ɨ 0.85 / 30 = 204,000 per year Minimum n_d = 510,204 / 204,000 = 2.50 → n_min = 3 Clamp ceiling 200 / (40 Ɨ 1.10 Ɨ 1.10) = 200 / 48.4 = 4.13 → 4 Shot ceiling 0.80 Ɨ 300 / (25 Ɨ 1.15) = 240 / 28.75 = 8.35 → 8 Plast. ceiling (40 Ɨ 1000 Ɨ 30 / 3600) / 28.75 = 333.3 / 28.75 = 11.6 → 11 n_max = 4 Window 3 to 4. Balanced cold-runner list 1, 2, 4, 8 … → pick 4 At 4 cavities: Press hours 510,204 Ɨ 30 / (4 Ɨ 3600 Ɨ 0.85) = 1,250.5 h (62.5 % of 2,000 h) Clamp load 4 Ɨ 48.4 = 193.6 US tons (fits 200) Shot 4 Ɨ 28.75 = 115 g = 38.3 % of barrel Life cycles 510,204 Ɨ 5 / 4 = 637,755 → SPI Class 102

With the radial or hot-runner rule the pick would be 3 cavities: 1,667 press hours (83.4 % of what is available), 145.2 tons of clamp, an 86.25 g shot at 28.8 % of the barrel and 850,340 lifetime cycles, still Class 102. Four cavities buy about 417 hours a year of spare press time for a little more tooling. Press Load the worked example to see the calculator reproduce these numbers.

Choosing between the counts in the window

Often more than one count fits. The floor is the least you can build; the ceiling is the most the press allows. Between them, the choice is economic. Each extra cavity adds cavity and core machining, more runner, and one more set of dimensions to sample and keep in tolerance. In return, every part takes less press time. When press hours are scarce or expensive, lean toward the ceiling. When the press has spare hours and the part is new, lean toward the floor, because a smaller tool is quicker to debug and a design change touches fewer cavities. Our mold cost-driver estimator shows which tooling choices drive cost up.

Balanced cavity layouts: 4 and 8 cavity H-pattern, 6 cavity radial Three top-view mold layouts. Left: 4 cavities fed by an H-pattern runner, each the same flow distance from the central sprue. Middle: 8 cavities in a two-level H-pattern, again equal distances. Right: 6 round cavities arranged radially around the sprue on equal spokes. A note below says a 2 by 3 grid fed from one sprue is not naturally balanced because the outer cavities are farther away. 4 cavities, H-pattern8 cavities, H-pattern6 cavities, radial spruesprue equal flow length to all 4equal at every branchequal spokes, any count A 2 Ɨ 3 grid fed from one sprue is not naturally balanced: the outer cavities sit farther away and fill last. red = runner Ā· grey = cavity Ā· black dot = sprue
Figure 2. Why cold-runner molds favour 1, 2, 4, 8 and 16 cavities. Each branch of an H-pattern splits the flow in two, so equal flow length needs a power-of-two count. Radial spokes and hot-runner manifolds can balance other counts.

Common mistakes

Cavity count decision flow Flow diagram. Step 1, demand floor from parts per year, cycle time, press hours and efficiency. Step 2, press ceiling from clamp, 80 percent shot and plasticizing rate. Step 3, round up to a balanced layout inside the window. Step 4, check press hours, shot above 20 percent and the SPI class from lifetime cycles. If the floor is above the ceiling, the options are a larger press, a second mold, more press hours or a shorter cycle. 1. Demand floorparts/yr Ć· shots/yrround up → n_min 2. Press ceilingclamp Ā· 80 % shotplasticizing → n_max 3. Balanced layoutsmallest 1-2-4-8…in the window 4. Check and classhours Ā· shot ≄ 20 %cycles → SPI class n_min greater than n_max: no single tool on this press works larger press Ā· second mold Ā· more press hours Ā· shorter cycle Ā· hot runner demand sets the floor, the press sets the ceiling
Figure 3. The order matters. Fixing the cavity count before checking the press is how a project ends up with a mold that only fits a machine it cannot get.

When the window is empty

If demand needs more cavities than the press can carry, no single tool on that press solves the problem. The calculator reports the most cavities the press allows and how many hours that would take. The usual ways out are a larger press with a higher count, two smaller molds running on two presses, more press hours, a shorter cycle (thinner, more uniform walls and better cooling; see the cycle time estimator), or a hot runner, which removes the runner from the shot weight and its area from the clamp load. Two molds also give you a backup if one is down for repair, which matters when one tool carries a whole product line.

When to use this calculator vs other methods

MethodUse it whenLimit
Demand floor and press ceiling (this page)Concept and quoting stage; comparing tool options; checking a cavity count someone has proposedCycle time and efficiency are assumptions; part quality limits are entered by you, not computed
Full economic optimization of tool cost against press cost per partReal tooling and press-hour costs are known and volumes are high enough that the difference mattersNeeds real cost data, which only the molder and toolmaker have
Mold-flow simulation of the chosen layoutLarge counts, family molds, thin walls or tight tolerances, where runner balance and fill pressure must be confirmedNeeds a near-final model and the exact grade's material data
Matching an existing tool for a similar partSame resin, size and volume as a part already runningDoes not transfer across big changes in demand or press

Design tips specific to cavity count

Questions and answers

How do you calculate how many cavities an injection mold needs?

Divide the parts you must mold per year, grossed up for scrap, by the shots one press can make in the hours you can give the job: n = D / (1 āˆ’ s) / (H Ɨ 3600 Ɨ efficiency / cycle time), then round up. Example: 500,000 good parts a year, 2 percent scrap, a 30 second cycle and 2,000 press hours at 85 percent efficiency give 204,000 shots a year against 510,204 parts needed, so n = 2.50 and at least 3 cavities. Then check the press can carry that count on clamp force, shot size and plasticizing rate.

Why are molds usually built with 1, 2, 4, 8 or 16 cavities?

With a cold runner, an H-pattern layout gives every cavity exactly the same flow length from the sprue only when the cavity count is a power of two. Equal flow length means each cavity fills and packs at the same pressure and time, so the parts come out the same size. Radial layouts and hot runners can balance other counts, such as 3, 6 or 12, which is why the calculator lets you choose either rule.

What limits the maximum number of cavities in a mold?

The press sets the ceiling. Total clamp force rises with every cavity, the whole shot should stay at or under about 80 percent of the barrel capacity, and the screw must melt a full shot every cycle. The mold must also fit between the tie bars and on the platens. Part quality is a further limit: a part with very tight tolerances may be better made in fewer, more carefully controlled cavities.

Do more cavities make the cycle time longer?

Usually only a little. Cooling time is set by the wall thickness, which does not change with cavity count, so the cycle stays close to the single-cavity figure. Injection and screw recovery take longer for a bigger shot, and a larger cold runner can take longer to cool than the part. Enter the cycle time you expect at the cavity count you are testing.

Is a mold with more cavities always better?

No. Each extra cavity adds tooling work and another set of dimensions to keep in tolerance, and a cavity that goes out of spec can force the whole tool to stop or be blocked off. More cavities pay back when press time is the bottleneck. When the press has spare hours, the smallest count that meets demand with margin is often the better choice.

How does cavity count change the SPI mold class?

SPI mold classes count cycles, not parts. Lifetime cycles equal lifetime parts divided by the cavity count, so going from 2 to 4 cavities halves the cycles each cavity sees. In the worked example, 5 years of demand on a 4-cavity tool is about 637,755 cycles, which is SPI Class 102 territory, while the same demand on 1 cavity would be over 2.5 million cycles and Class 101.

What efficiency figure should I use?

Use your molder's measured figure for this press and part family if you have one. The efficiency on this page covers downtime and running slower than the set cycle; scrap is entered separately so it is not counted twice. 85 percent is only the page's default assumption and should be replaced with real data.

Ask JCH about your cavity count

Unsure whether to go 4 or 8, or whether your press can carry it? Ask our AI assistant. It answers from this website, and our tooling team follows up if you want.

AI assistant. Answers can be wrong; nothing it says is a quote or a promise.

Want a cavity and press plan for your part?

This calculator gives an engineering estimate. Our tooling team reviews your part, resin and volumes, and recommends cavity count, runner type and press size together.

Book a 30-min call Send a drawing or sample