JCH markJCH Design & Manufacturing JCH Design & Manufacturing BBB Accredited Business Ask for time with Jack
Updated 2026-10-22  ·  JCH Design & Manufacturing

PCBA: what to ask before you send Gerbers

Most board problems are decided before the files leave your desk.

Filed under Engineering and services

The short answer: send the assembler a complete package and a short list of questions, and read the answers before you read the price. Gerbers alone are not a build package.

What goes in the package

Gerbers or ODB++, a pick-and-place file, a BOM with manufacturer part numbers and approved alternates, assembly drawings with polarity marked, and the acceptance class you expect the boards to meet.

An SMT placement head working over a circuit board
Placement. The BOM decides what lands here.

Questions about the BOM

Which parts are long-lead or single-source? Which alternates will the assembler propose, and who approves them? Who buys the parts, and who carries the risk of a substitution? Those answers are the core of an EMS contract manufacturing agreement, so get them in writing.

Questions about the line

What paste inspection and automated optical inspection run on every board? Is X-ray available for hidden joints? How are moisture-sensitive parts stored and baked?

A reflow oven line in an electronics assembly hall
Reflow. Ask what inspection follows it.

Questions about test

Who writes the functional test, and who owns the fixture? What happens to a board that fails: rework, scrap or a report back to you?

First article and after

Ask for a first article report against your drawing before the lot runs, and agree how a change on either side is approved. A board that passes once and drifts later is a process question, not a design one.

A finished circuit board fitted into a molded housing
The board in its housing. Test the assembly, not just the board.

Straight answers

Are Gerbers enough to quote PCB assembly?

No. A PCB assembler also needs a pick-and-place file, a BOM with manufacturer part numbers and alternates, assembly drawings and the acceptance class you expect.

Who should approve part substitutions on a PCBA build?

You should. Agree in writing that no alternate goes on the board without your approval, and keep the approved alternates on the BOM.

pcbaelectronicsbomfirst articlecontract manufacturing

How this note was made: researched and drafted with AI assistance, checked against the sources listed below and edited at JCH Design & Manufacturing.

Have something you need made?

Bring an idea, a sketch, a sample or a finished product. Jack reads every inquiry himself.

(321) 323-4474 Ask for time with Jack