What Jack knows, written down.
Straight notes on getting a product made in Asia — tooling, quoting, qualifying a factory, and the questions worth asking before you send anybody money. No sales copy. Sources on every claim. For the work itself, see Jack's contract manufacturing services.
Free tools: the AQL sampling calculator (ANSI/ASQ Z1.4) and the injection mold cost estimator.
No sales copy. Sources on every claim.

Blister vs clamshell packaging: materials, costs and MOQs
A blister is a formed bubble sealed to a printed card; a clamshell is a hinged shell that closes around the product. They look alike on a peg hook and differ in cost, security and how angry your customer gets opening one.
Read: Blister vs clamshell packaging: materials, costs and MOQs ›Corrugated POP displays: floor stands, counter units and hook displays
Most retail displays that sit on a store floor for a season are printed corrugated board. What the formats are, why the board and the print decide the cost, what published prices look like, and what to send for a quote.
Read: Corrugated POP displays: floor stands, counter units and hook displays ›Two-shot molding vs overmolding: which does your part need?
Both put a soft layer on a rigid part. One uses two ordinary tools, the other one complex tool and a two-barrel press. Volume decides most of it; the bond decides whether the part survives.
Read: Two-shot molding vs overmolding: which does your part need? ›What is powder coating? A buyer's guide to the finish
Powder coating is paint applied as a dry, electrostatically charged powder and baked into a hard film. How the line runs, which powder suits which use, and the two tests that turn "powder coat, black" into a finish you can inspect.
Read: What is powder coating? A buyer's guide to the finish ›Tariff math: what moving one product from China to Taiwan actually saves
A single molded part, landed in the US from China and from Taiwan, line by line: the duty stack, the Merchandise Processing Fee, the harbor fee, freight and the one-time cost of moving the tool. Then the number that decides it: how much more Taiwan can charge before the move stops paying.
The landed-cost math of moving one product ›Minimum order quantity: what is really negotiable, and what isn't
A factory's minimum is its setup, material and machine-time costs written as a quantity. Know which cost drives the number and you'll know what you can negotiate, what you can't, and when the minimum is really a no.
Read: Minimum order quantity: what is really negotiable, and what isn't ›What an injection mold really costs: typical ranges, lead times and custody
Published 2026 ranges for prototype aluminum, P20 and hardened H13 tools, single, multi-cavity and family molds, hot runner against cold, US against China — and why we will not print a Taiwan number we cannot back.
Injection mold cost ranges and lead times ›Taiwan vs. China Tariffs for US Importers in 2026: What Actually Stacks
China-origin goods still carry the 2018 Section 301 lists, and since July 24, 2026 a 12.5% duty on top. Taiwan-origin goods are generally topped up to 10% combined. The 2026 rate stack, layer by layer, with the official sources.
Taiwan vs. China tariffs in 2026 ›Taiwan is a small island. The shops are not interchangeable.
Taiwan's tool and machine-tool trades sit in a few dozen kilometers. That density is why a principal who knows the shops is not the same as a catalog of factories. Origin is still the floor — a China lot stuffed at Keelung is still China.
Taiwan's tool shops, and why they differ ›The golden sample was perfect. Lot three was not.
A signed sample proves one unit was made well. It does not prove the line will hold that unit at volume. Here is the swap — resin, steel, a different line, a quiet subcontract — and the only cheap place to catch it.
Why an approved sample drifts by lot three ›Reverse engineering from a sample: what the part can't tell you
A scanned sample gives you geometry, not a specification. Here's what a scan-to-CAD job actually produces, where tolerance decisions get made, how first-article inspection can quietly lie to you, and when reverse engineering is the wrong move.
Reverse engineering from a sample ›The last payment is your only leverage: payment terms that actually protect you
Why the standard 30/70 wire means you pay in full before you see a single part, what goes wrong when you do, and how to restructure the balance so some money still sits behind something you can verify.
Payment terms that protect a buyer ›Is it a real factory? How to check before you send a deposit
The business license settles most of it in ten minutes, and almost nobody reads the right field. Here is the order to run the checks in, what an audit costs, and the findings that should end the conversation.
How to verify a factory before a deposit ›How to compare injection mold quotes: why one part quotes $8,000 and $30,000
A mold quote prices a set of assumptions: shot life, steel, cavities, trial rounds and who owns the tool. How to read what each quote assumes, where the money really goes, and the five lines that make competing quotes comparable.
How to compare injection mold quotes ›