RFQ Package Completeness Checker
Does my quote package have everything a manufacturer needs? Only when it settles eight things: the 3D geometry, a toleranced drawing at the same revision as the model, the material grade, finish and color, the first order plus annual volume, packaging and labeling, how parts will be inspected and accepted, and the dates you are working to. Choose the option that describes each item in your package. The checker totals a weighted score, halts on gaps that would leave a shop guessing at the basics, and names the three fixes that recover the most points.

Planning aid only, and an engineering estimate rather than a quote: the score shows how much a supplier would have to assume from your package, not what the part costs or whether it can be made.
How this works
A request for quotation is a bet that the supplier reads your files the way you meant them. Whatever the package leaves open, the estimator fills with an assumption, and each shop assumes something different, so the quotes stop being comparable. MakerVerse's June 26, 2026 guide to CNC machining RFQs puts it in two sentences: “Every missing spec forces a supplier to guess. That guess is a conditional estimate, not a binding quote.” This checker turns that idea into a number. It looks at the eight items named in the question, asks how completely your package states each one, and multiplies by a weight.
Why these weights. None of the checklists cited here weights its items, so these numbers are ours (our reading). The logic behind them: the items a shop needs before it can even choose a process and size a tool carry the most, and the items that refine a price already roughed out carry less. Berkeley Sourcing Group's Go-To Manufacturing Checklist, a PDF hosted on energy.gov, explains that a 3D file lets the manufacturer judge how the tool must be built and “exactly know how much material goes into the product (and runner),” which is why geometry sits at the top. Quantity sits level with material because P&A International's RFQ checklist for molded parts says plainly “Annual volume — drives tooling class.” Packaging gets the smallest weight in our reading: it sits outside the part and the tool, though a blank here still leaves quotes hard to line up.
1. The 3D model: send a solid, not a picture of one
The MakerVerse guide splits the two core files cleanly: “The 3D model (STEP format preferred) communicates geometry, the 2D PDF drawing communicates manufacturing intent,” and it adds, “Neither alone is sufficient.” P&A's molded-part checklist asks for “A 3D model (STEP/IGES) and a drawing.” The Berkeley Sourcing Group checklist is blunter about plastics: “If you are looking for an exact quote for a plastic part, you will need a 3D file.” A mesh is a weaker substitute. SendCutSend's FAQ turns STL away for its cut parts and asks for 2D vector files or STEP to price them. The checker gives full credit to STEP or native CAD with a STEP export, 0.6 to a surface-only IGES that someone must close into a solid, 0.2 to a mesh, and nothing (plus a hard stop) when there is no model at all. Our answer page on which CAD file formats to send goes through the formats one by one.
2. The drawing: tolerances, GD&T, and one revision letter
The model fixes nominal shape; the drawing says how far each feature may move and which features matter. MakerVerse lists what the drawing carries as “tolerances, GD&T, surface finish, revision, and material callout.” Its tolerancing advice for machined parts is to “Apply standard ISO 2768-mK to non-critical geometry” and to hold tight limits for “the 3–5 features that functionally require them”; that count comes from a CNC context, so treat it as one guide's rule of thumb, not a law for molded parts. Full credit therefore needs critical features flagged, GD&T where the function depends on form or location, a general tolerance note, and the same revision as the model. A general note alone earns half. A revision mismatch earns 0.25 and a hard stop, because MakerVerse describes exactly what follows: “The supplier must stop and ask which document governs.” The Specification Drafting Tips sheet on the West Virginia Purchasing Division's site says the same in procurement language: “Avoid contradictory requirements.” A missing drawing costs all 18 points but is not a stop, since Decatur Mold's list of required information for mold quotations asks you to “Submit detailed drawings or CAD files of your part.” To translate a title-block class into numbers, use the ISO 2768 general tolerance lookup; for position callouts, the GD&T true position calculator.
3. Material: a grade, not a family
MakerVerse is direct about metals: “A complete material callout includes alloy, temper, condition, and applicable standard.” For plastics, P&A's form asks for “material / grade” and Decatur Mold asks you to “Indicate the type of plastic resin or material you plan to use.” A family name such as ABS or nylon leaves the grade open, so whichever grade the estimator picks becomes one more assumption inside the price. The checker credits a family at 0.4 and a named grade, or a grade defined by a material standard, at 1. No material at all is a hard stop. If the choice is still open, list the candidates and ask for a price on each; the plastics material selector can narrow the list first.
4. Finish and color: say it per face
Berkeley Sourcing Group's advice is short: “For colors, use Pantone numbers,” and “Don’t forget about the surface finishes!” AIM Processing, a plastics molder, asks buyers in a 2017 post on estimate details, “What is the function of the part and its critical features or cosmetic needs?” Full credit goes to a color reference plus a finish or texture for every visible face, or to an explicit statement that the part is natural color with no cosmetic surface. Giving one without the other earns half. The weight is modest in our reading because finish and color refine a price once geometry, material and volume have shaped the tooling decision.
5. Quantities: the first order and the year
MakerVerse asks you to “State the order quantity, the estimated annual usage, and whether this is a prototype or production run,” and its own table gives the consequence of skipping it as “Supplier tools for wrong volume; incomparable quotes.” AIM Processing wants a buyer's expected annual use, which it abbreviates EAU, along with a sense of how many years the program should run. The West Virginia sheet requires the same of public buyers: “Quantity – include either actual or estimated quantity.” Both numbers earn full credit; either alone earns half; neither is a hard stop. Once you have them, the cavity count calculator and the mold class selector show what the annual figure does to the tool.
6. Packaging and labeling
Federal buyers give this its own section. The uniform contract format in the Federal Acquisition Regulation, Table 15-1 at FAR 15.204-1, lists Section D as “Packaging and marking,” and FAR 15.204-2(d) tells the contracting officer to “Provide packaging, packing, preservation, and marking requirements, if any.” That format is written for negotiated federal contracts, so we borrow its structure, not its legal weight. On the manufacturer side, P&A lists “Post-machining, assembly and packaging” among the finish and delivery items. Full credit needs the unit pack, the count per carton and the label or marking content; a partial statement such as “bulk pack” earns half. Our printable RFQ checklist lists the packaging details item by item.
7. Inspection and acceptance
FAR Table 15-1 gives Section E to “Inspection and acceptance,” and FAR 15.204-2(e) says to “Include inspection, acceptance, quality assurance, and reliability requirements.” MakerVerse asks buyers to define “which dimensions require CMM measurement, whether a First Article Inspection report is required, and whether material certs or a Certificate of Conformance is needed.” The checker looks for four elements: the critical dimensions, a first-article report requirement, a cosmetic acceptance standard, and a lot sampling plan. All four earn full credit and some earn half. For the sampling plan, the AQL sampling calculator gives sample sizes and accept and reject numbers.
8. Target dates
MakerVerse: “Specify the required delivery date and any scheduling constraints or split-shipment needs.” The West Virginia sheet: “Time – include actual date or time frame for performance.” FAR Section F covers “Deliveries or performance.” AIM Processing separates “first-parts” from “production-ready” parts, which is why full credit here needs a date for first samples and a date for production delivery, with the one that cannot move marked. One date earns half. These are your targets; the supplier's reply tells you what it can plan around.
Worked example: a first package for a molded enclosure
A founder sends out a two-part plastic enclosure. The package has a STEP file, a PDF drawing still at revision B while the model is at revision C, “PC/ABS” as the material, a Pantone number but no texture call, a first order of 2,000 pieces with no annual figure, and a single date. Packaging and inspection are not mentioned. Press Load the worked example to put the same answers into the checker.
Polishing the model gains nothing here: it already earns all 20 of its points. The cheap wins are paperwork: re-issue the drawing at revision C with its critical features flagged, write four lines on inspection, pick the exact grade, and add one annual estimate. That moves the package from a hard stop to ready to send without touching the CAD.
Three published checklists, run through the checker
To test the arithmetic against something outside this page, we built three packages that contain only what a published checklist names, then scored them. Mapping each list onto our options is our reading, shown item by item so you can disagree with any line. The buttons above the result panel load each case.
| Item (weight) | MakerVerse CNC RFQ guide | P&A molded-part RFQ checklist | Berkeley Sourcing Group checklist |
|---|---|---|---|
| 3D CAD (20) | STEP preferred: 1 → 20 | STEP/IGES named: 1 → 20 | “a 3D file”: 1 → 20 |
| 2D drawing (18) | tolerances, GD&T, revision: 1 → 18 | drawing plus critical dimensions (our reading: critical dimensions named): 1 → 18 | 2D drawings, tolerances “wherever possible”: 0.5 → 9 |
| Material (15) | full callout: 1 → 15 | material / grade: 1 → 15 | material per BOM line, no grade: 0.4 → 6 |
| Finish and color (8) | finish steps, no color: 0.5 → 4 | finish and texture, no color: 0.5 → 4 | Pantone plus surface finishes: 1 → 8 |
| Quantities (15) | order qty plus annual usage: 1 → 15 | annual volume plus call-off pattern: 1 → 15 | how many pieces, no annual: 0.5 → 7.5 |
| Packaging (6) | not named: 0 | named, not detailed: 0.5 → 3 | not named: 0 |
| Inspection (10) | CMM dims, FAI, certs, production sampling; no cosmetic standard: 0.5 → 5 | not named: 0 | not named: 0 |
| Target dates (8) | required delivery date: 0.5 → 4 | not named: 0 | not named: 0 |
| Score | 81.0, quotable with questions | 75.0, quotable with questions | 50.5, question round |
None of the three reaches 85 on its own, and the gaps cluster in the same three places: packaging, inspection and dates. Those are exactly the items the federal uniform contract format breaks out as Sections D, E and F. Read together, the manufacturer lists cover the part and the procurement format covers the delivery, and a complete package needs both halves.
What published lists ask for that this score leaves out
- Function and environment. MakerVerse asks for the “function the part must perform” and the “operating environment such as temperature, pressure, or chemical exposure.” Put a short paragraph in the cover note.
- A bill of materials for assemblies. Berkeley Sourcing Group gives the BOM its own page; our answer on building a bill of materials covers what a factory reads from it.
- A sample or prototype. The same checklist argues “If a picture is worth 1000 words, then a prototype is worth 1000 pictures.”
- Secondary operations and tooling status. Decatur Mold asks you to “Include any special requirements, such as secondary operations or press specifications that affect mold size or design,” and P&A asks whether the job is a new tool or a transfer of an existing one.
- Compliance. P&A's form has a compliance line for the regulations a product must meet; name them if they apply.
- Cost targets. P&A's form lists “Target cost,” and Decatur Mold asks you to “Share any budgetary constraints you have.” This page scores completeness only, so cost is outside the score by design.
Common mistakes
- Sending the model and calling it a drawing. Unless the shop has agreed to work from annotations inside the model, it will look for limits on a drawing and find none.
- Two files, two revisions. Put the revision letter in both file names and in the title block, and check it on the morning you send.
- “Plastic” or “ABS” as the material. Name the grade, or name the candidates and ask for each to be priced.
- One quantity with no year behind it. A first order of 2,000 says nothing about whether the year holds 2,000 or 200,000, and the yearly figure is the one P&A ties to tooling class.
- Leaving inspection to the shop. Whatever you do not define, the supplier defines for you, and the next supplier defines differently.
- Tight tolerances on every dimension. Flag the features that matter and let a general tolerance note cover the rest.
When to use this checker, and when something else
| Tool or document | Answers | Limit |
|---|---|---|
| This checker | Is the package complete enough to send, and which gap costs the most? | Says nothing about whether the design can be molded or machined |
| DFM readiness scorecard | Is the CAD itself ready for a molding quote: draft, walls, radii, undercuts? | Looks at the design, not at the paperwork around it |
| RFQ checklist (PDF) | A printable list of package contents, item by item | No scoring; you judge completeness yourself |
| The supplier's own RFQ form | What that one shop asks before it quotes | Varies from shop to shop; quotes from different forms may not line up |
| A federal solicitation in uniform contract format | Government buys, where Sections C through F set the requirements | Written for negotiated federal contracts; heavier than most private jobs need |
Sources for the method. RFQ contents for machined parts, the drawing's role, revision conflicts, material callouts, quantity and annual usage, inspection scope and delivery dates: MakerVerse, How to Write a CNC Manufacturing RFQ That Gets Accurate Quotes (Aline Costa, June 26, 2026). Molded-part RFQ items including annual volume, tolerances, finish and packaging: P&A International RFQ checklist (PDF). The 3D file for plastic parts, Pantone colors, surface finishes, quantities, BOM and prototype: Berkeley Sourcing Group, Go-To Manufacturing Checklist (PDF on energy.gov). Annual use, function and cosmetic needs, first parts versus production parts: AIM Processing (Jon Gelston, January 5, 2017). Drawings or CAD, resin, volume, timeline and special requirements for mold quotes: Decatur Mold Tool & Engineering. STL not accepted for pricing cut parts: SendCutSend FAQ. Sections D, E and F of the uniform contract format: FAR 15.204-1 and FAR 15.204-2. Quantity, time and contradiction rules for public specifications: Specification Drafting Tips (West Virginia Purchasing Division site). The weights, credits, bands, hard stops, tie rule and the mapping of the three published lists are ours. Each linked source was opened on November 20, 2026, and every quotation was checked against the live page or the PDF file itself.
Reviewed by the JCH tooling team · updated November 2026.
RFQ package questions
Does my quote package have everything a manufacturer needs?
It does when a stranger could price the part without phoning you. That takes a solid model, a drawing carrying the same revision letter, a named grade, color and surface callouts, the opening lot size plus a yearly figure, how parts get packed and labeled, how they will be accepted, and when you want samples and production. Score your files above to see which heading is costing you the most.
Is a STEP file enough without a drawing?
It can open the conversation; Decatur Mold, for one, will take drawings or CAD to start a mold quote. A firm number is different. Limits, datums and the features that matter have no home unless they sit on a drawing or in model annotations the shop has agreed to use, so without them the estimator picks tolerances for you. Send both files under one revision letter.
Why does a supplier want annual volume when I am placing only one order?
The yearly figure shapes the tooling, and the opening lot mostly shapes setup. P&A's own quick-reference table pairs single-cavity production tools with mid volume and multi-cavity or hot-runner tools with high volume. If you honestly cannot say, offer a cautious, a likely and an optimistic figure. A range lets the shop quote sensibly; silence makes it guess.
What should the inspection section of an RFQ say?
Name the dimensions that decide whether the part works, state if a first-article report is required, describe what counts as a cosmetic reject and on which faces, and give the lot sampling plan, for instance the AQL and inspection level from whichever sampling standard your contract names. Add any paperwork expected with each shipment, such as a certificate of conformance or material certs.
What if all I have is a sketch, a photo or a sample?
The checker will show a hard stop on the model, and for a firm price that is fair. It is no reason to sit still: a designer can turn a sketch into a solid, and a physical sample can be measured or scanned. Get that step done first, then return and fill in the other seven headings.
How were the weights chosen, and how far should I trust the score?
They are our judgment, not figures from a standard or a survey. Headings that decide the process and the tool weigh most; headings that adjust a price already roughed out weigh least. Use the total to rank your gaps. The hard stops matter more than the total, and the cited checklists matter more than either.
Why is a mismatched revision a hard stop instead of a few lost points?
Two files that disagree make the estimator choose one, and a quote on the wrong letter can end with steel cut to an old design. MakerVerse counts a tool built to an obsolete spec among the most expensive slips between prototype and production. Re-checking the letters is the simplest fix in the whole package.
Ask JCH about your quote package
Not sure which callouts your drawing needs, or what to write under inspection for a first order? Type the question here. The site's AI assistant answers from material published on jchtrade.com, and your checker result goes along with it as context.
Answers come from software and may contain errors; none of them is an offer, a price or a commitment.
Want a second reader before the package goes out?