Cracked plastic parts: the tooling and material changes to review
Short answer: Cracks in molded parts usually start where the design, tool or process left stress or a weak spot: thin or uneven walls, sharp inside corners, a gate in the wrong place, a weld line at a load point, ribs and bosses that fight the wall, or wet or wrong resin. Check each against failed parts before cutting steel.
Filed under Quality and inspection
This is general engineering, not legal advice and not a safety determination. A recall has its own legal and reporting process; follow your regulator and your counsel. No change listed here guarantees a part is safe. Test the changed part against your own requirements.
Start with the failed parts
Before changing anything, collect cracked and good parts and record where each crack starts, the lot, the cavity number, the molding date and how the part was used. A crack that always starts in one spot, from one cavity, points somewhere different from cracks that appear anywhere after months in use. Change one thing at a time, or you will not know what fixed it.
What to review
| Area | What to look for | Typical change to consider |
|---|---|---|
| Wall thickness | Thin walls at a load point, thick sections with voids, abrupt changes in thickness | Even out walls, make transitions gradual, core out thick sections |
| Inside corners | Sharp inside corners where stress concentrates | Add a radius in the steel |
| Gate location and size | A gate close to a load point, jetting, high stress near the gate | Move or resize the gate |
| Weld lines | Lines where flow fronts meet, which are weaker, at holes, bosses or load points | Move the gate, improve venting or change the flow path so the weld line lands elsewhere |
| Ribs and bosses | Ribs too thick for the wall, no radius at the base, bosses split by screws or inserts | Resize ribs, add radii and gussets, check screw and insert fit |
| Resin grade | A grade not suited to the load, temperature or chemicals; too much regrind | Review the grade against the supplier's data; set a regrind limit |
| Moisture and drying | Hygroscopic resins molded wet, which can turn brittle | Write a drying specification and check it is followed every run |
| Process | Molded-in stress from packing, cooling or mold temperature | Re-establish the process window and document it |
Chemicals and environment
Some plastics crack under stress when they meet certain chemicals, such as cleaners, oils or solvents, even though neither the stress nor the chemical would crack them alone. This is environmental stress cracking. If the cracks appeared in use, list what the part touches and check the resin supplier's chemical resistance data.
Verify before and after the change
- Run the changed tool and process and approve a new first article.
- Test changed parts under the loads, temperatures and chemicals of real use, against your own requirements.
- Record the change in the mold record and keep retained samples from before and after.
A DFM review of the part file is a practical first look at walls, gates and ribs before any steel is changed.
Straight answers
Why do molded plastic parts crack?
Usually because stress meets a weak spot: a sharp corner, a thin wall, a weld line, an overstressed boss, wet or wrong resin, molded-in stress, or a chemical the part was not designed for.
Can moving the gate fix cracking?
Sometimes. Moving a gate changes where weld lines form and where stress is highest, but it is a steel change, so confirm the cause with failed parts first.
Are weld lines weaker than the rest of the part?
Usually, yes. Where two flow fronts meet, the plastic may not fully bond, so weld lines at a load point are a common crack start.
How can wet resin make parts brittle?
Some resins absorb moisture. Molded without proper drying, they can degrade in the barrel and produce weaker, more brittle parts.
Will these changes make my part safe?
No single change guarantees that. Test the changed part against your own requirements, and follow your regulator and counsel on any recall.
JCH is a trade name of WJH & JCH Global Trading LLC. Jack works with vetted partner factories and does not own the plants.