JCH Design & ManufacturingJCH Design & Manufacturing BBB Accredited BusinessBook a 30-min call

Free tools · Your numbers only

Cost per part, break-even and quote gap calculator.

Three free tools for comparing manufacturing quotes. Work out the landed cost of each part from your own numbers, find the quantity where a higher tooling cost pays for itself, and check what a quote leaves out. Nothing is pre-filled: you enter the figures from your own quotes.

1 · Landed cost per part

2 · Break-even quantity between two quotes

3 · Quote gap checker

Tick what your quote states in writing.

These tools do arithmetic on the numbers you enter. They are not a quote, and JCH publishes no prices; a real number comes from a quote against your drawing.

How to use them

Compare quotes on the same basis.

Two quotes rarely line up: one has a cheaper tool and a higher part price, another leaves freight or samples out. Put both through the same arithmetic, at the quantity you actually expect to order, and ask each supplier for whatever the gap checker shows is missing.

RFQ checklist · Mold cost estimator · Tooling agreement checklist

How do I calculate the landed cost per part?

Add the unit price, any other per-part costs, the freight divided by the quantity, the duty on each part, and the one-time costs (tooling, samples, setup) divided by the quantity. The result changes with quantity, because the one-time costs are spread over more parts.

How do I compare two quotes with different tooling costs?

Find the break-even quantity: the difference in one-time costs divided by the difference in per-part costs. Below that quantity the option with the lower one-time cost is cheaper; above it, the option with the lower per-part cost wins.

What should a manufacturing quote state?

At least the tool material, cavity count, expected tool life, included slides and sample rounds, who owns the tool, storage terms, exclusions, the Incoterm and place, country of origin, payment terms, timing to first samples, the inspection plan and the packaging spec.

Is duty charged on the freight as well as the part price?

For US imports, usually not. Customs value is normally the transaction value, the price actually paid for the goods, and international freight and insurance are left out of it (19 U.S.C. 1401a; 19 CFR 152.103). That is why this calculator applies the duty rate to the unit price only. Your customs broker confirms the basis for each entry.

How many parts should I spread the tooling cost over?

Over the quantity you are confident you will buy from that tool, not over its rated life. Rated life only says how many shots the tool can survive: the SPI mold classes run from Class 105 prototype tools (500 cycles or fewer) to Class 101 tools built for more than a million. If your first order is 5,000 parts and repeats are uncertain, enter 5,000; entering ten times that makes the tool look ten times cheaper per part than it really is.

Which costs are most often missing from a per-part comparison?

Packaging and labeling, outgoing inspection, the customs broker's fee and the US government fees on a formal entry: the merchandise processing fee (0.3464% of entered value, between a yearly minimum and maximum, 19 CFR 24.23) and, for ocean freight, the harbor maintenance fee (0.125%, 19 CFR 24.24). Put the ones you know into Other per-part costs so both quotes carry them.

Want a second read of a quote?

Send it with the drawing. Jack will tell you plainly what it includes and what it leaves out.

Book a 30-min call

Ask JCH about a quote you are comparing

Two quotes that will not line up? Ask our AI assistant what a line item usually covers or what to ask the supplier. It answers from this website, and Jack follows up if you want.

AI assistant. Answers can be wrong; nothing it says is a quote or a promise.

Book a 30-min callCall